A Matter Judged: Subrogating Insurers Should Beware of Prior Suits Involving the Insured
March 25, 2024 —
Gus Sara - The Subrogation StrategistIn New Jersey Mfrs. Ins. Co. v. Lallygone LLC, No. A-2607-22, 2024 N.J. Super. Unpub. LEXIS 120, the Appellate Division of the Superior Court of New Jersey (Appellate Division) considered whether New Jersey Manufacturers Insurance Company (the carrier) could bring a subrogation action after its insured, Efmorfopo Panagiotou (the insured), litigated and tried claims related to the same underlying incident with the same defendant, Lallygone LLC (the defendant). The Appellate Division affirmed the trial court’s finding that the prior lawsuit extinguished the carrier’s claims.
In Lallygone LLC, the insured hired the defendant to renovate a detached garage on his property. In March 2022, while the defendant’s employees were removing existing concrete slabs, the garage collapsed. After the incident, the insured stopped paying the defendant. In addition, the insured filed a claim with the carrier, which ultimately paid the insured over $180,000 for the damage under its property policy. The carrier sent a subrogation notice letter to the defendant.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and WilliamsMr. Sara may be contacted at
sarag@whiteandwilliams.com
Delays in Filing Lead to Dismissal in Moisture Intrusion Lawsuit
September 09, 2011 —
CDJ STAFFThe Alabama Court of Civil Appeals has upheld a summary judgment in the case of Franklin v. Mitchell. Walter Mitchell, doing business as Southern Classic Construction built a new home for the Franklins. The Franklins moved into the home in October 2001. In April 2006 they discovered sagging floors in both the bathroom and kitchen. They contacted Mitchell who suggested the flooring might be defective. The Franklins spent eight months attempting to contact the flooring manufacturer.
In March 2007, the Franklins had the home inspected. The sagging was determined to be due to a loss of strength in the decking because of condensation from the air conditioning system. Air returns were not properly sealed and drawing moisture into the structure. There was mold on the decking and floor joints.
When Mitchell was contacted by the Franklins, he told them his one-year warranty had expired but had the HVAC subcontractor, Southern Mechanical Heating & Air (owned by Mitchell’s father, Jim Mitchell), look at the situation. SMHA replaced and braced subfloors. Later, they entered the crawl space to tape ducts, seal the air return, and insulate the air vent housing. The Franklins were not satisfied with the repairs, as not all the ducts were taped, nor were the air vent housings insulated.
Franklin complained to Walter Mitchell who again cited his one-year warranty. Jim Mitchell said he would not report complaints to his insurer, stating that the repairs were unnecessary, that the work had been done correctly in the first place, and it was only done at the request of Walter Mitchell.
In February 2009, the Franklins sued Walker Mitchell. Mitchell denied the claims, citing in part the statute of limitations. Mitchell also filed complaints against three subcontractors, including his father’s firm. Mitchell received a summary judgment as the case started after Alabama’s six-year statute of limitations.
The appeals court rejected the Franklin’s argument that the claim of damage did not start until they were aware it was due to a construction defect. The court noted that as Walter Mitchell was licensed as a “residential home builder, the statute the Franklins cite did not apply, as it concerns architects, engineers, and licensed general contactors.”
Nor did they feel that Mitchells’ claim that his warranty had expired were sufficient to override the statute of limitations, quoting an earlier case, “Vague assurances do not amount to an affirmative inducement to delay filing suit.” Their claim of subsequent negligent repairs was rejected because Mitchell did not direct the specific actions taken by his father’s firm.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
BWB&O Senior Associate Kyle Riddles and Associate Alexandria Heins Obtain a Trial Victory in a Multi-Million Dollar Case!
May 01, 2023 —
Dolores Montoya - Bremer Whyte Brown & O'Meara LLPBremer Whyte Brown & O’Meara, LLP is excited to share that Newport Beach Senior Associate Kyle Riddles and Associate Alexandria Heins obtained a significant trial victory on behalf of their client in a multi-million dollar dispute stemming from the construction of a commercial expansion project at a beachfront resort.
The owner of the resort alleged that the general contractor was responsible for a significant delay to the completion of the expansion project. The general contractor filed a cross-complaint against BWB&O’s client in an attempt to pass through the delay claims to BWB&O’s client. The general contractor’s delay expert alleged a total 441 days of delay to the completion of the project. A significant portion of the delay was apportioned to BWB&O’s client, for which it faced substantial contractual damages. Senior Associate Kyle Riddles expertly crossed key witnesses and obtained testimony that was extremely favorable to its client.
Read the court decisionRead the full story...Reprinted courtesy of
Dolores Montoya, Bremer Whyte Brown & O'Meara LLP
California Court of Appeal: Inserting The Phrase “Ongoing Operations” In An Additional Endorsement Is Not Enough to Preclude Coverage for Completed Operations
September 14, 2017 —
Gary Barrera - California Construction Law BlogIn a victory for additional insureds, a California appeals court held, in Pulte Home Corp. v. American Safety Indemnity Co., Cal.Ct.App. (4th Dist.), Docket No. D070478 (filed 8/30/17), that an insurer’s denial of coverage for completed operations based on the inclusion of the phrase “ongoing operations” in an additional insured endorsement, was improper. Additionally, an insurer wishing to limit coverage under an additional insured endorsement to ongoing operations must do so via clear and explicit language.
Read the court decisionRead the full story...Reprinted courtesy of
Gary Barrera, Wendel Rosen Black & Dean LLPMr. Barrera may be contacted at
gbarrera@wendel.com
Unjust Enrichment Claims When There Is No Binding Contract
December 04, 2023 —
David Adelstein - Florida Construction Legal UpdatesA recent appellate opinion starts off, “This is a typical South Florida construction dispute.” (See case citation at the bottom) Let’s see, is it? No. It’s a garden variety payment dispute where the parties did NOT have a binding contract. Why? That’s for a different day (because the smart practice is ALWAYS to have a contract!) but it touches on the equitable, unjust enrichment claim. And it touches on competing unjust enrichment claims and the apportionment of those claims. In other words, can both parties be right on their unjust enrichment claims?
An owner hired a general contractor for home renovations. Work started but the relationship soured and the general contractor did not complete the work. The general contractor filed a payment dispute against the owner based on unpaid invoices. It pled alternative theories of recovery against the owner: breach of contract and unjust enrichment. The owner filed a counterclaim against the general contractor for the same claims. During the non-jury trial, the general contractor presented unpaid invoices along with testimony that the invoices represented the value of services rendered. The owner presented evidence of the completion of work damages.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
University of Tennessee’s New Humanities Building Construction Set to Begin
January 14, 2015 —
Beverley BevenFlorez-CDJ STAFFConstruction preparation of the Tennessee Volunteer’s $30.5 million new humanities building has begun, according to The Tennessean. The 80,000 square-foot facility will become the largest building on the university’s campus, and will feature 23 classrooms, 18 labs, 11 collaborative study areas, 56 offices, 20 adjunct faculty workrooms as well as an outdoor theater and courtyard.
“This is a significant milestone in the history of the college,” President Jerry Faulkner told The Tennessean. “This building has been on our wish list for about 12 years in terms of wanting to have this facility available, so for the first time our humanities division is going to have a home of its own.”
Read the court decisionRead the full story...Reprinted courtesy of
Housing Woes Worse in L.A. Than New York, San Francisco
September 03, 2014 —
Nadja Brandt and John Gittelsohn – BloombergJeanette Cross took out a payday loan to cover her May rent of $1,600 in South Los Angeles. She skipped car and insurance payments to keep a roof over her head.
“I’m further and further behind,” Cross, a 34-year-old single mother of four, said in a telephone interview. “I make a payment on one thing and don’t pay others.”
She isn’t alone. Angelenos use a bigger slice of their paychecks on shelter than people in New York, San Francisco or Miami, studies show. Surging property prices in the second-largest U.S. city are driving up costs in once-impoverished areas while pushing lower-income households into converted garages or to distant suburbs, where the tradeoff is hours stuck in traffic each day.
Reprinted courtesy of
Nadja Brandt, Bloomberg and
John Gittelsohn, Bloomberg
Ms. Brandt may be contacted at nbrandt@bloomberg.net; Mr. Gittelsohn may be contacted at johngitt@bloomberg.net
Read the court decisionRead the full story...Reprinted courtesy of
Your Contract is a Hodgepodge of Conflicting Proposals
January 06, 2016 —
Craig Martin – Construction Contractor AdvisorOuch. That’s what a court called a contract to remediate petroleum contamination at a number of gas stations in New York. Sometimes, it’s hard to believe the contracts that get signed.
Environmental Risk hired Science Applications to remediate petroleum contamination at 47 gas stations. Environmental Risk had previously entered into a Professional Services Master Agreement with Science Applications, but also required Science Applications to sign three separate, but basically identical, subcontracts called the Project Specific Scopes of Work. So, right from the start, there were four contracts that could apply to Science Applications’ work.
Read the court decisionRead the full story...Reprinted courtesy of
Craig Martin, Lamson, Dugan and Murray, LLPMr. Martin may be contacted at