The Drought Is Sinking California
August 19, 2015 —
Jennifer Oldham – BloombergLand in California’s central valley agricultural region sank more than a foot in just eights months in some places as residents and farmers pump more and more groundwater amid a record drought.
The ground near Corcoran, 173 miles (278 kilometers) north of Los Angeles, dropped about 1.6 inches every 30 days. One area in the Sacramento Valley was descending about half-an-inch per month, faster than previous measurements, according to a report released Wednesday by the Department of Water Resources. NASA completed the study by comparing satellite images of Earth’s surface over time.
“Groundwater levels are reaching record lows -- up to 100 feet lower than previous records,” Mark Cowin, the department’s director, said in a statement. “As extensive groundwater pumping continues, the land is sinking more rapidly and this puts nearby infrastructure at greater risk of costly damage.”
Read the court decisionRead the full story...Reprinted courtesy of
Jennifer Oldham, Bloomberg
Court of Appeal Puts the “Equity” in Equitable Subrogation
October 05, 2020 —
Garret Murai - California Construction Law BlogSubrogation as a concept is well understood in insurance circles. According to the Institute of Risk Management Institute’s glossary of insurance terms subrogation is “the assignment to an insurer by the terms of [a] policy or by law, after payment of a loss, of the rights fo the insured to recover the amount of the loss from one legally liable for it.” In other words, if an insurer comes out of pocket for something someone else broke, the insurer can turn to that responsible party for reimbursement of its out of pocket costs.
Typically, subrogation is, as stated in IRMI’s glossary of insurance terms, a matter of contract and the rights and responsibilities of parties are set forth within the terms of a policy. However, subrogation may, as stated in IRMI’s glossary, also be matter of law. And this is where equitable subrogation comes in.
“Equitable subrogation,” according to IRMI, is “the right of subrogation granted under common law when one party has made a payment on behalf of another and becomes entitled to whatever recovery rights the other party has against a responsible third party.”
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
HP Unveils Cheaper, 3-D Printing System to Spur Sales
November 05, 2014 —
Jack Clark - BloombergHewlett-Packard Co. (HPQ) unveiled a new 3-D-capable computer and speedier 3-D printer technology as it prepares to spin off its personal-computer and printer businesses into a stand-alone company.
The company today introduced Sprout, an $1,899 computer that lets people scan and manipulate 2-D and 3-D objects. It will be available early next month online and in some U.S. stores. Hewlett-Packard also said new 3-D printer technology will make the process cheaper and faster than competitors.
The Palo Alto, California-based company is betting that 3-D technology will help revitalize sales and spur growth in the printer industry. More than 2.3 million 3-D printers will ship in 2018, up from about 108000 this year, according to researcher Gartner Inc. Earlier this month, Hewlett-Packard said it would split into two companies by late 2015, with one focused on corporate hardware services and the other -- dubbed HP Inc. -- on PCs and printers.
Read the court decisionRead the full story...Reprinted courtesy of
Jack Clark, BloombergMr. Clark may be contacted at
jclark185@bloomberg.net
Leveraging the 50-State Initiative, Connecticut and Maine Team Secure Full Dismissal of Coverage Claim for Catastrophic Property Loss
March 23, 2020 —
Regen O'Malley - Gordon & Rees Insurance Coverage Law BlogOn behalf of Gordon & Rees’ surplus lines insurer client, Hartford insurance coverage attorneys Dennis Brown, Joseph Blyskal, and Regen O’Malley, with the assistance of associates Kelcie Reid, Alexandria McFarlane, and Justyn Stokely, and Maine counsel Lauren Thomas, secured a full dismissal of a $15 million commercial property loss claim before the Maine Business and Consumer Court on January 23, 2020. The insured, a wood pellet manufacturer, sustained catastrophic fire loss to its plant in 2018 – just one day after its surplus lines policy expired.
Following the insurer’s declination of coverage for the loss, the wood pellet manufacturer brought suit against both its agent, claiming it had failed to timely secure property coverage, as well as the insurer, alleging that it had had failed to comply with Maine’s statutory notice requirements. The surplus lines insurer agreed to extend the prior policy several times by endorsement, but declined to do so again. Notably, the insured alleged that the agent received written notice of the non-renewal prior to the policy’s expiration 13 days before the policy’s expiration. However, the insured (as well as the agent by way of a cross-claim) asserted that the policy remained effective at the time of the loss as the insured did not receive direct notice of the decision not to renew coverage and notice to the agent was not timely. Although Maine’s Attorney General and Superintendent intervened in support of the insured’s and agent’s argument that the statute’s notice provision applied such that coverage would still be owed under the expired policy, Gordon & Rees convinced the Court otherwise.
At issue, specifically, was whether the alleged violation of the 14-day notice provision in Section 2009-A of the Surplus Lines Law (24-A M.R.S. § 2009-A), which governs the “cancellation and nonrenewal” of surplus lines policies, required coverage notwithstanding the expiration of the policy. The insured, the agent, and the State of Maine intervenors argued that “cancellation or nonrenewal” was sufficient to trigger the statute’s notice requirement, and thus Section 2009-A required the insurer to notify the insured directly of nonrenewal. In its motion to dismiss, Gordon & Rees argued on behalf of its client that Section 2009-A requires both “cancellation and nonrenewal” in order for the statute to apply. Since there was no cancellation in this case – only nonrenewal – Gordon & Rees argued that Section 2009-A is inapt and that the insurer is not obligated to provide the manufacturer with notice of nonrenewal. Alternatively, it argued that the statute is unconstitutionally vague and unenforceable.
Read the court decisionRead the full story...Reprinted courtesy of
Regen O'Malley, Gordon & ReesMs. O'Malley may be contacted at
romalley@grsm.com
Questions of Fact Regarding Collapse of Basement Walls Prevent Insurer's Motion for Summary Judgment
December 19, 2018 —
Tred R. Eyerly - Insurance Law HawaiiThe court denied the insurer's motion for summary judgment on whether the policy covered the collapse of basement walls based upon factual issues presented. Sirois v. USAA Cas. Ins. Co., 2018 U.S. Dist. LEXIS 158508 (D. Conn. Sept. 18, 2018).
The insureds' purchased their home in 2010. In December 2015, a crack in the basement wall was noticed. It was not thought to be a serious problem. But in 2016, the insured read an article about defective concrete problems affecting homeowners in Connecticut. An inspector, Dean Soucy, was hired. He found faults and cracks in the foundation walls. Thereafter, a claim was submitted to USAA under homeowners' policies issued over the years to the insureds. USAA denied coverage.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
California Bid Protests: Responsiveness and Materiality
January 06, 2016 —
Garret Murai – California Construction Law BlogIt can be a rough and tumble world out there. And in the case of public works construction in California, this includes bid disputes.
California’s competitive bidding laws require that a public works contract be awarded to the “lowest responsible bidder.” However, as we’ve mentioned before, there are two requirements which must be satisfied for a bidder to be determined to be the lowest responsible bidder: (1) the awarded bidder’s bid must be “responsive”; and (2) the awarded bidder must be “responsible.”
In a case decided this past month, DeSilva Gates Construction v. Department of Transportation, Case No. C074521 (December 14, 2015), the California Court of Appeals for the Third District addressed the first of these two requirements, whether two bids on $34 million highway widening project were responsive, which in turn involves a two-step process: (1) whether the bids were responsive or not; and (2) if not, whether the variance in the bids were “material” or “immaterial.”
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Arbitration—No Opportunity for Appeal
October 22, 2014 —
Craig Martin – Construction Contractor AdvisorLast week I presented to the Great Plains Chapter of the American Society of Professional Estimators on arbitration and litigation. Some of the questions related to the difficulty of appealing an arbitrator’s decision. A Florida appellate court recently confirmed this difficulty.
In Village at Dolphin Commerce Center, LLC v. Construction Service Solutions, LLC, a contractor filed an arbitration claim against the owner to get paid for its work. The owner claimed that the contractor could not maintain the claim to get paid because the contractor was not licensed. Apparently, there is a law in Florida that a contractor unlicensed at the time of the contract cannot maintain an action in Florida for unpaid work.
Read the court decisionRead the full story...Reprinted courtesy of
Craig Martin, Lamson, Dugan and Murray, LLPMr. Martin may be contacted at
cmartin@ldmlaw.com
Retaining Wall Contractor Not Responsible for Building Damage
July 20, 2011 —
CDJ STAFFThe Court of Appeals of Indiana ruled on July 8 in the case of Rollander Enterprises, Inc. v. H.C. Nutting Co. Judge Baily wrote the opinion affirming the decision of the trial court.
The case involved an unfinished condominium complex, the Slopes of Greendale, in Greendale, Indiana. Rollander is a real estate development company incorporated in Ohio. One of the issues in the case was whether the case should be settled in the Indiana courts or be tried in Ohio. The project was owned by a special purpose entity limited liability corporation incorporated in Indiana.
Rollander hired Nutting to determine the geological composition of the site. Nutting’s report described the site as “a medium plastic clay containing pieces of shale and limestone.” The court summarized this as corresponding with “slope instability and landslides.” Rollander then hired Nutting to design the retaining walls, which were constructed by Scherziner Drilling.
After cracking was discovered on State Route 1, the walls were discovered to be inadequate. More dirt was brought in and a system of tie-backs was designed to anchor the walls. Not only were the tie-backs unsightly, local officials would not approve the complex for occupancy. Further, the failure of the wall below one building lead to damage of that building.
The court concluded that since almost all events occurred in Indiana, they rejected Rollander’s contention that the case should be tried in Ohio. Further, the court notes “the last event making Nutting potentially liable on both claims was an injury that occurred in Indiana and consequently, under the lex loci delicti analysis, Indiana law applies.”
Nor did the court find that Nutting was responsible for the damage to the rest of the project, citing an Indiana Supreme Court ruling, that “there is no liability in tort to the owner of a major construction project for pure economic loss caused unintentionally by contractors, subcontractors, engineers, design professionals, or others engaged in the project with whom the project owner, whether or not technically in privity of contract, is connected through a network or chain of contracts.”
The court concluded:
Because Rollander was in contractual privity with Nutting, and Indy was connected to Nutting through a chain of contracts and no exception applies, the economic loss rule precludes their recovery in tort. Damage to Building B was not damage to "other property," and the negligent misrepresentation exception to the economic loss rule is inapplicable on these facts. The trial court therefore did not abuse its discretion by entering judgment on the evidence in favor of Nutting on the Appellants' negligence and negligent misrepresentation claims.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of