BERT HOWE
  • Nationwide: (800) 482-1822    
    townhome construction building expert Fairfield Connecticut mid-rise construction building expert Fairfield Connecticut concrete tilt-up building expert Fairfield Connecticut institutional building building expert Fairfield Connecticut housing building expert Fairfield Connecticut retail construction building expert Fairfield Connecticut tract home building expert Fairfield Connecticut Medical building building expert Fairfield Connecticut production housing building expert Fairfield Connecticut low-income housing building expert Fairfield Connecticut high-rise construction building expert Fairfield Connecticut structural steel construction building expert Fairfield Connecticut parking structure building expert Fairfield Connecticut custom home building expert Fairfield Connecticut multi family housing building expert Fairfield Connecticut Subterranean parking building expert Fairfield Connecticut condominium building expert Fairfield Connecticut landscaping construction building expert Fairfield Connecticut industrial building building expert Fairfield Connecticut custom homes building expert Fairfield Connecticut condominiums building expert Fairfield Connecticut hospital construction building expert Fairfield Connecticut
    Fairfield Connecticut construction safety expertFairfield Connecticut structural engineering expert witnessesFairfield Connecticut construction project management expert witnessesFairfield Connecticut expert witness commercial buildingsFairfield Connecticut consulting engineersFairfield Connecticut roofing construction expertFairfield Connecticut architectural expert witness
    Arrange No Cost Consultation
    Building Expert Builders Information
    Fairfield, Connecticut

    Connecticut Builders Right To Repair Current Law Summary:

    Current Law Summary: Case law precedent


    Building Expert Contractors Licensing
    Guidelines Fairfield Connecticut

    License required for electrical and plumbing trades. No state license for general contracting, however, must register with the State.


    Building Expert Contractors Building Industry
    Association Directory
    Home Builders & Remo Assn of Fairfield Co
    Local # 0780
    433 Meadow St
    Fairfield, CT 06824

    Fairfield Connecticut Building Expert 10/ 10

    Builders Association of Eastern Connecticut
    Local # 0740
    20 Hartford Rd Suite 18
    Salem, CT 06420

    Fairfield Connecticut Building Expert 10/ 10

    Home Builders Association of New Haven Co
    Local # 0720
    2189 Silas Deane Highway
    Rocky Hill, CT 06067

    Fairfield Connecticut Building Expert 10/ 10

    Home Builders Association of Hartford Cty Inc
    Local # 0755
    2189 Silas Deane Hwy
    Rocky Hill, CT 06067

    Fairfield Connecticut Building Expert 10/ 10

    Home Builders Association of NW Connecticut
    Local # 0710
    110 Brook St
    Torrington, CT 06790

    Fairfield Connecticut Building Expert 10/ 10

    Home Builders Association of Connecticut (State)
    Local # 0700
    3 Regency Dr Ste 204
    Bloomfield, CT 06002

    Fairfield Connecticut Building Expert 10/ 10


    Building Expert News and Information
    For Fairfield Connecticut


    Tesla Powerwalls for Home Energy Storage Hit U.S. Market

    Insurer's Denial of Coverage to Additional Insured Constitutes Bad Faith

    Construction Litigation Roundup: “That’s Not How I Read It”

    Real Estate & Construction News Round-Up (11/03/21)

    DA’s Office Checking Workers Comp Compliance

    Additional Insured Secures Defense Under Subcontractor's Policy

    Start-up to Streamline Large-Scale Energy Renovation

    Colorado General Assembly Sets Forth Prerequisites for an Insurance Company to Use Failure to Cooperate as a Defense to a Claim for First Party Insurance Benefits

    What The U.S. Can Learn from China to Bring Its Buildings to New Heights

    A Court-Side Seat: Appeals and Agency Developments at the Close of 2020

    Life After McMillin: Do Negligence and Strict Liability Causes of Action for Construction Defects Still Exist?

    DOJ to Prosecute Philadelphia Roofing Company for Worker’s Death

    Infrastructure Money Comes With Labor Law Strings Attached

    More Details Emerge in Fatal Charlotte, NC, Scaffold Collapse

    Honoring Veterans Under Our Roof & Across the World

    Affordable Housing should not be Filled with Defects

    Texas Couple Claim Many Construction Defects in Home

    Safer Schools Rendered Unsafe Due to Construction Defects

    Federal Regulatory Recap: A Summary of Recent Rulemaking Actions Taken or Proposed Affecting the Energy Industry

    The General Assembly Seems Ready to Provide Some Consistency in Mechanic’s Lien Waiver

    Morrison Bridge Allegedly Crumbling

    “Genuine” Issue of “Material” Fact and Summary Judgments

    What is an Alternative Dispute Resolution?

    Justice Dept., EPA Ramp Up Environmental Justice Enforcement

    Georgia Law: “An Occurrence Can Arise Where Faulty Workmanship Causes Unforeseen or Unexpected Damage to Other Property”

    Court of Appeal Shines Light on Collusive Settlement Agreements

    Court Grants Summary Judgment to Insurer in HVAC Defect Case

    Quick Note: Notice of Contest of Claim Against Payment Bond

    Contractor Sentenced to Seven Years for Embezzling $3 Million

    2017 Legislative Changes Affecting the Construction Industry

    Things You Didn't Know About Your Homeowners Policy

    Pallonji Mistry, Indian Billionaire Caught in Tata Feud, Dies at 93

    Home Repair Firms Sued for Fraud

    Contractual Assumption of Liability Does Not Bar Coverage

    The Peak of Hurricane Season Is Here: How to Manage Risks Before They Manage You

    Paris ‘Locks of Love’ Overload Bridges, Threatening Structures

    No Bad Faith In Filing Interpleader

    How to Defend Stucco Allegations

    A Quick Checklist for Subcontractors

    Alaska Supreme Court Finds Insurer Owes No Independent Duty to Injured Party

    No Repeal Process for Rejected Superstorm Sandy Grant Applications

    Public Adjuster Cannot Serve As Disinterested Appraiser

    Guilty Pleas Draw Renewed Interest In Nevada’s Construction Defect Laws

    Have the Feds Taken Over Arbitration?

    Circumstances In Which Design Professional Has Construction Lien Rights

    Goldberg Segalla Welcomes William L. Nimick

    With Vice President's Tie-Breaker, US Senate Approves Far-Reaching Climate Bill

    Governor Signs Permit Extension Bill Extending Permit Deadlines to One Year

    Encinitas Office Obtains Complete Defense Verdict Including Attorney Fees and Costs After Ten Day Construction Arbitration

    Depreciation of Labor in Calculating Actual Cash Value Against Public Policy
    Corporate Profile

    FAIRFIELD CONNECTICUT BUILDING EXPERT
    DIRECTORY AND CAPABILITIES

    The Fairfield, Connecticut Building Expert Group at BHA, leverages from the experience gained through more than 7,000 construction related expert witness designations encompassing a wide spectrum of construction related disputes. Leveraging from this considerable body of experience, BHA provides construction related trial support and expert services to Fairfield's most recognized construction litigation practitioners, commercial general liability carriers, owners, construction practice groups, as well as a variety of state and local government agencies.

    Building Expert News & Info
    Fairfield, Connecticut

    Forethought Is Key to Overcoming Construction Calamities

    February 10, 2020 —
    Without warning, an under-construction structure in the southern United States suffered a catastrophic collapse. The tragedy resulted in the death of several people. As a result, engineering and construction post-collapse forensics experts engaged in an 18-month investigation. Those involved in the design and build project included the general contractor hired by the owner, a prime engineer, a consulting peer-review engineer and a prime structural design firm supported by a sub-consulting structural engineer. Although significant cracking was noticed several weeks before the failure, no one sounded the alarm or deemed the cracking worthy of corrective action. In their findings, forensic experts found the collapse resulted from the combined failure of the general contractor, engineers and even the owner, who all failed to shut down the work once the cracking reached unacceptable levels and/or take the appropriate actions needed to secure the public safety and mitigate the risk. This was even after the general contractor requested that the engineer-of-record and design manager assess the structure’s extreme cracking. Consequently, the choice to not seriously investigate the crack or seek an independent peer review to design a rectification plan contributed directly to the tragedy. This is typically referred to within the industry as a “negligent professional design error.” Reprinted courtesy of Mitch Cohen, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the court decision
    Read the full story...
    Reprinted courtesy of
    Mr. Cohen may be contacted at mitch.cohen@rtspecialty.com

    SEC Climate Change Disclosure Letter Foreshadows Anticipated Regulatory Changes

    November 08, 2021 —
    Washington, D.C. (October 13, 2021) - In late September 2021, the Division of Corporation Finance of the Securities and Exchange Commission (SEC) issued a Sample Letter providing guidance to companies on how their climate disclosures will be analyzed for compliance with material risk reporting obligations. The Sample Letter precedes the SEC’s issuance of mandatory climate-related disclosure rules anticipated by year-end and signals a greater focus on specific information used to support securities filings, a development that businesses should take seriously. The Sample Letter builds on climate change guidance the SEC issued in 2010 and identifies nine categories of disclosures the SEC suggests may be material risks that must be disclosed. These include:
    • Consistency between a company’s corporate social responsibility report and its SEC filings;
    • Risks associated with climate-related legislation, regulation, or policy, and resulting compliance costs;
    • Litigation risks related to climate change; and
    • Risks linked to an array of operational and market factors, including capital expenditures, continuity of business operations, supply chain stability, changing demand, reputation, availability of credit and insurance, and other climate-change related potential impacts on the financial condition of the company.
    Reprinted courtesy of Karen C. Bennett, Lewis Brisbois and Jane C. Luxton, Lewis Brisbois Ms. Bennett may be contacted at Karen.Bennett@lewisbrisbois.com Ms. Luxton may be contacted at Jane.Luxton@lewisbrisbois.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    Limiting Plaintiffs’ Claims to a Cause of Action for Violation of SB-800

    November 18, 2011 —

    There has been a fair share of publicity about the SB-800 amendments to the Civil Code (Civil Code section 896, et seq.) that codified construction defect litigation in 2002. Most of the publicity is geared toward the pre-litigation standards allowing a builder the right to repair before litigation is commenced by a homeowner. Less focus and attention has been given to the fact that violation of the SB-800 performance standards is being used by plaintiff’s counsel as an additional tool in the plaintiff’s pleading tool box against builders. Closer scrutiny to SB-800 reveals that those provisions should in fact act as a limitation to the pleading tools available to plaintiffs and an additional tool for builders in the defense of cases governed by SB-800.

    The typical construction defect complaint contains the boiler plate versions of numerous causes of action. These causes of action include Strict Liability, Negligence, Negligence Per Se, Breach of Contract, Breach of Contract – Third-Party Beneficiary, Breach of Express Warranties, Breach of Implied Warranties, among others. The wide array of causes of action leave a defendant “pinned to the wall” because they require a complex defense on a multitude of contract and tort related causes of action. Furthermore, the statutes of limitations as to these claims widely differ depending upon if the particular defect is considered latent or patent. The truth of the matter remains, no matter what the circumstances, if a construction defect matter ultimately goes to trial, it is inevitable that plaintiffs will obtain a judgment on at least one of these causes of action.

    On its own, the Strict Liability cause of action can be a thorn in a defendant’s side. A builder is obviously placing a product into the stream of commerce and strict liability is a tough standard to defend against, particularly when it concerns intricate homes comprised of multiple components that originally sold for hundreds of thousands of dollars. A Negligence cause of action can also be difficult to defend because the duty of care for a builder is what a “reasonable” builder would have done under the circumstances. An interpretation of this duty of care can easily sway a jury that will almost always consist of sympathetic homeowners. A Negligence Per Se cause of action can also leave a defendant vulnerable to accusations that a builder violated the Uniform Building Code or a multitude of other obscure municipal construction-related code provisions during the construction of the home. Lastly, the Breach of Contract cause of action leaves a builder relying on dense and intricate purchase and sale agreements with dozens of addenda which leave the skeptical jurors turned off by what they view as one-side, boilerplate provisions. Ultimately, when a matter is about to go to trial, the complexity of these complaints can benefit a plaintiff and increase a plaintiff’s bargaining power against a defendant who is attempting to avoid a potentially large judgment.

    Enter the SB-800 statutes. The SB-800 statutes apply to all homes sold after January 1, 2003. Civil Code section 938 specifically states that “[t]his title applies only to new residential units where the purchase agreements with the buyer was signed by the seller on or after January 1, 2003.” (Civil Code §, 938.) As time progresses, more residential construction defect cases will exclusively fall under the purview of SB-800. Slowly but surely more SB-800 governed litigation is being filed, and its exclusive application is looming on the horizon.

    On its surface, this “right to repair” regime has left builders with a lot to be desired despite the fact that it is supposed to allow the builder the opportunity to cure any deficiencies in their product before litigation can be filed by potential plaintiffs. However, the application of the time line for repair has shown to be impractical for anything but the most minor problems involving only small numbers of residential units. Moreover, the fact that the fruits of the builder’s investigation into the claimed defects in the pre-litigation context can freely be used as evidence against it in litigation makes builders proceed with trepidation in responding with a repair. For these reasons, more SB-800 litigation can be expected to result due to the shortcomings of the pre-litigation procedures, and savvy defense counsel should anticipate the issues to be dealt with in presenting the defense of such cases at trial.

    This fact should not necessarily be met with fear or disdain. Within the SB-800 statutes, the legislature made it clear that they were creating a new cause of action for construction defect claims, but it further made it clear that this cause of action is a plaintiff’s exclusive remedy. The legislature giveth, but at the same time, the legislature taketh away. Throughout numerous provisions within the SB-800 statutes, the Civil Code states that claims for construction defects as to residential construction are exclusively governed by the Civil Code, and that the Civil Code governs any and all litigation arising under breaches of these provisions. Civil Code section 896 specifically states:

    In any action seeking recovery of damages arising out of, or related to deficiencies in, the residential construction … the claimant’s claims or causes of action shall be limited to violation of, the following standards, except as specifically set forth in this title. (Civil Code §, 896.)

    Civil Code section 896 then provides approximately fifty-plus standards by which a construction defect claim is assessed under that provision. Civil Code section 896 covers everything from plumbing to windows, and from foundations to decks, and in several instances expressly dictates statutes of limitations as to specific areas of construction that severely truncate the 10-year latent damage limitations period. As for any construction deficiencies that are not enumerated within Civil Code section 896, Civil Code section 897 explicitly defines the intent of the standards and provides a method to assess deficiencies that are not addressed in Civil Code section 896. Civil Code section 897 states:

    Intent of Standards

    The standards set forth in this chapter are intended to address every function or component of a structure. To the extent that a function or component of a structure is not addressed by these standards, it shall be actionable if it causes damage. (Civil Code §, 897.)

    Therefore, Civil Code section 897 acts as a catch-all by which defects that are not covered within Civil Code section 896 can be evaluated on a damage standard mirroring the Aas case (damages must be present and actual). The result of sections 896 and 897 being read in combination is a comprehensive, all-inclusive set of performance standards by which any defect raised by Plaintiffs can be evaluated and resolved under a single SB-800 based cause of action.

    Civil Code section 943 makes clear that a cause of action for violation of SB-800 performance standards is a plaintiff’s sole remedy for a residential construction defect action. Specifically, Civil Code section 943 states:

    Except as provided in this title, no other cause of action for a claim covered by this title or for damages recoverable under 944 is allowed. In addition to the rights under this title, this title does not apply to any action by a claimant to enforce a contract or express contractual provision, or any action for fraud, personal injury, or violation of a statute. (Civil Code §, 943.)

    Civil Code section 944 provides the method for computing damages within a construction defect action, as follows:

    If a claim for damages is made under this title, the homeowner is only entitled to damages for the reasonable value of repairing any violation of the standards set forth in this title, [and] the reasonable cost of repairing any damages caused by the repair efforts… . (Civil Code §, 944.)

    A cursory review of these statutes yields the conclusion that the legislature was attempting to create an exclusive cause of action that trumps all other causes of action where SB-800 applies. The remedy available to plaintiffs is limited to that allowed by the Civil Code. As noted above, “[n]o other cause of action for a claim covered by this title…is allowed.” (Civil Code §, 943.) Therefore, Civil Code sections 896, 897, 943, and 944 specifically prohibit the contract-based and tort-based causes of action typically pled by plaintiffs.

    Plaintiff’s counsel has seized upon the language of section 943 to advance the argument that SB-800 still allows a plaintiff to advance typical contract and tort based causes of action. On the surface, this argument may seem compelling, but a minimum of scrutiny of the express language of section 943 dispels this notion. Section 943 says that it provides rights “[i]n addition” to those under the SB-800 Civil Code provisions. Clearly, the language in section 943 is intended to expressly underscore the fact that a plaintiff is not precluded from seeking relief in addition to that allowed under SB-800 for damages not arising from a breach of the SB-800 standards or for damages in addition to those recoverable under Section 944. This language does not provide an unfettered license to bring a Strict Liability, Negligence or other cause of action against a builder where SB-800 applies.

    In fact, this language only keeps the door open for plaintiffs to pursue such causes of action not arising from a breach of the SB-800 standards should there be such supporting allegations. For example, if a plaintiff alleges that a builder breached an “express contractual provision” related to the timing of the completion of the home and close of escrow, and the contract specifies damages in this regard, a plaintiff may have a viable separate cause of action for Breach of Contract for recovery of those damages precisely because that is not an issue expressly dealt with in SB-800 in the performance standards under sections 896 and 897, or in the damage recovery terms under 944. As it stands, the vast majority of complaints are seeking redress for violation of the same primary right; that is, defects specifically outlined in Section 896 and 897 or which result in damages as stated in Section 944.

    So, how does a builder defend against a complaint that contains multiple causes of action regarding construction defects for a home sold after January 1, 2003? There are numerous ways to approach this. First and foremost, these superfluous and improper causes of action can be attacked by demurrer seeking dismissal of all causes of action other than the cause of action alleging violation of SB-800. If the the time period within which to file a demurrer has passed already, a motion for judgment on the pleadings can be utilized to attack the improper causes of action in the same way as a demurrer can be used for this purpose.

    The limitation to a demurrer or motion for judgment on the pleadings is that the judge is restricted to viewing only the four corners of the pleading when making a ruling. It is typical for plaintiffs’ counsel to cleverly (or one might even say, disingenuously) leave the complaint purposely vague to avoid a successful defense attack on the pleadings by not including the original date the residence was sold. In that instance, a motion for summary adjudication can be used to attack a plaintiff’s complaint. By simply providing evidence that the homes were originally sold after January 1, 2003, the improper causes of action should be subject to dismissal by summary adjudication. If the plaintiff is a subsequent purchaser, the builder still has recourse to enforce the pleading limitations under SB-800. Civil Code section 945 states that “[t]he provisions, standards, rights, and obligations set forth in this title are binding upon all original purchasers and their successors-in-interest.” (Civil Code §, 945.)

    Attacking a plaintiff’s complaint to eliminate multiple causes of action can have numerous benefits. The practical result is that a plaintiff will only have one viable cause of action. The advantage is that the SB-800 performance standards include the defined performance standards and shortened statutes of limitations periods with regard to specific issues. Furthermore, as to defects which are not specifically provided for in Civil Code section 896, Civil Code section 897 requires a proof of actual damages. Therefore, a plaintiff must provide evidence of current damages and not simply conditions that may potentially cause damage in the future.

    The Appellate Courts have yet to directly address and interpret these SB-800 provisions. The time for that is undoubtedly drawing near. For now, however, plaintiffs will have to find ways to accurately plead construction defect claims within the confines of one cause of action for breach of the performance standards enumerated within the Civil Code.

    Printed courtesy of Lorber, Greenfield & Polito, LLP. Mr. Patel can be contacted at spatel@lorberlaw.com and Mr. Verbick at tverbick@lorberlaw.com.

    Read the court decision
    Read the full story...
    Reprinted courtesy of

    Jury Trials and Mediation in Philadelphia County: Virtually in Person

    July 27, 2020 —
    When will the trial court in Philadelphia County be open for jury trials in civil actions? While a precise prediction, given the current state of our trial courts in the middle of the COVID-19 pandemic, is difficult to make, what is known is that the use of virtual technology is likely permanently changing the landscape of civil litigation, including depositions, mediation, and other forms of alternative dispute resolution. Even civil jury trials, at least in the near term and during the pandemic, are being conducted virtually, either by private agreement, or through the courts, as is occurring in Texas and most recently in Florida with its pilot virtual trial program in five of its trial courts. While it is necessary at present for the parties to consent to a virtual trial, courts may ultimately compel the parties’ participation. Regardless, litigants and their counsel are well advised to understand the complexities and manner of a virtual trial. Seasoned trial attorneys have long experienced and are comfortable with virtual depositions bringing distant counsel, parties and witnesses together through technology to present testimony. The use of virtual technology as a means for court arguments and hearings, mediation, and alternative dispute resolution, while novel and emerging as the new normal, is territory where a comfort level can be achieved. And while distinctions most assuredly exist, recent experience has demonstrated that court arguments, mediations and depositions can be conducted effectively remotely and virtually. Legal issues certainly do remain in the context of the deposition of parties to a civil action regarding whether a lawyer’s physical presence in the same room with a party-witness can be demanded, and whether courts would compel a virtual deposition during the COVID-19 pandemic where such physical presence of a party and their attorney could not be achieved. Undoubtedly these issues will be resolved, likely sooner than later, given the scope of the pandemic in certain areas. Reprinted courtesy of White and Williams LLP attorneys Andrew F. Susko, Robert G. Devine and Daniel J. Ferhat Mr. Susko may be contacted at suskoa@whiteandwilliams.com Mr. Devine may be contacted at deviner@whiteandwilliams.com Mr. Ferhat may be contacted at ferhatd@whiteandwilliams.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    Federal Contractors – Double Check the Terms of Your Contract Before Performing Ordered Changes

    July 08, 2019 —
    As federal contractors may be aware, the general rule when performing a contract for the federal government is that only the contracting officer (“CO”) can bind the government. Often, the CO delegates responsibility to a contracting officer’s representative (“COR”). While in some cases a COR may be able to bind the federal government, the contract may limit that ability exclusively to the CO. Important for our clients, it is the responsibility of the contractor to determine whether the COR can legally bind the federal government when ordering changes to the scope of work. [1] This is true even when a COR possesses apparent authority to order changes to the work, and when the project is almost exclusively overseen by COR’s. [2] A recent case highlights the dangers of a contractor relying on the orders of a COR when performing work outside the scope of a contract. In Baistar Mechanical Inc., a contractor was awarded a maintenance and snow removal contract with the federal government. The contract expressly stated that only the CO had contracting authority regarding additional or changed work. [3] However, Baistar, the contractor, argued it was directed by the contracting officer’s representatives to perform work outside of the contract. Read the court decision
    Read the full story...
    Reprinted courtesy of Jonathan Schirmer, Ahlers Cressman & Sleight PLLC
    Mr. Schirmer may be contacted at jonathan.schirmer@acslawyers.com

    Disruption: When Did It Start and Where Will It End?

    June 25, 2019 —
    If change is the only constant—as was famously observed by a Greek philosopher circa 500 B.C.—then why single out some changes as “disruption”? Disruption is about more than just technology; it’s about more, even, than the rapid rollout and development of technology in the past couple of decades. The word disruption refers to processes or products that are fundamentally different from what is currently in use and that render unforeseen, large-scale changes. Early discussions of disruption (the term was coined by Harvard Business School professor Clayton M. Christensen in a 1995 Harvard Business Review article) compared incremental change in existing systems, which are usually supported by established corporations, to innovations that start out as something completely fresh, limited in their appeal and flawed in initial iterations. The construction industry was—and still is—late to adopt most technologies and late in experiencing overall disruption. It also lags behind other industries when it comes to efficiency and productivity. McKinsey reported that construction is one of the “least digitized industries in the world,” despite employing approximately 7% of the world’s working-age population and representing one of the world economy’s largest sectors. Disruption is likely to be fast approaching now, even for the construction industry. But its delay may confer the benefit of allowing construction companies to learn from other industries’ mistakes. Reprinted courtesy of Brian Gallagher, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the court decision
    Read the full story...
    Reprinted courtesy of

    Defining Constructive Acceleration

    March 22, 2021 —
    When it comes to the definition of “constructive acceleration,” the case of Fraser Const. Co. v. U.S., 384 F.3d 1354 (Fed.Cir. 2004) is a cited case and contains an instructive definition, quoted below, for proving a constructive acceleration claim. In a nutshell, a constructive acceleration claim is when the contractor incurs added costs for trying to complete the contract on time when it should be provided extensions of time to perform based on excusable delay (i.e., delay not caused by the contractor). These added costs could be bringing in additional supervision to manage the work, adding manpower to perform the work, working overtime, working weekends, adding more shift work, stacking trades, etc. However, just because a contractor claims they have been constructively accelerated does not make it so. The contractor has to actually ask for an extension of time based on an excusable delay and the owner either denied the extension or unreasonably sat on the request for an extension of time; thus, the contractor incurred significant costs to accelerate in order to finish the project on time because it was deprived of a requested time extension for excusable delay. Read the court decision
    Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris, P.A.
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Quick Note: Notice of Contest of Claim Against Payment Bond

    January 31, 2018 —
    On private jobs where the general contractor has an unconditional payment bond, subcontractors, sub-subcontractors and suppliers need to serve a notice of nonpayment to preserve payment bond rights. Read the court decision
    Read the full story...
    Reprinted courtesy of David Adelstein, Florida Construction Legal Updates
    Mr. Adelstein may be contacted at dadelstein@gmail.com