California MCLE Seminar at BHA Sacramento July 11th
June 11, 2014 —
Kimberly Albarq-CDJ STAFFThere are just three weeks remaining to sign up for Bert L. Howe & Associate’s next California MCLE seminar, UNDERSTANDING CONSTRUCTION DEFECT LITIGATION.
This activity will be presented on Friday, July 11th at noon, at BHA’s Sacramento office:
2520 Venture Oaks Way
Suite 435
Sacramento, CA 95833
There is no cost for attendance at this seminar and lunch will be provided.
This course has been approved for Minimum Continuing Legal Education credit by the State Bar of California Committee on MCLE in the amount of 1.0 credit hours, of which 0.0 credit hours will apply to legal ethics/professional responsibility credit. The seminar will be presented by Don MacGregor, general contractor and project manager.
Water intrusion through doors, windows and roofing systems, as well as soil and foundation-related movement, and the resultant damage associated therewith, are the triggering effects for the vast majority of homeowner complaints today and serve as the basis for most residential construction defect litigation. The graphic and animation-supported workshop/lecture activity will focus on the residential construction process from site preparation through occupancy, an examination of associated damages most often encountered when investigating construction defect claims, and the inter-relationships between the developer, general contractor, sub trades and design professionals. Typical plaintiff homeowner/HOA expert allegations will be examined in connection with those building components most frequently associated with construction defect and claims litigation.
The workshop will examine:
* Typical construction materials, and terminology associated with residential construction
* The installation process and sequencing of major construction elements, including interrelationship with other building assemblies
* The parties (subcontractors) typically associated with major construction assemblies and components
* An analysis of exposure/allocation to responsible parties.
Attendance at THE UNDERSTANDING CONSTRUCTION DEFECT LITIGATION seminar will provide the attendee with:
* A greater understanding of the terms and conditions encountered when dealing with common construction defect issues
* A greater understanding of contractual scopes of work encountered when reviewing construction contract documents
* The ability to identify, both quickly and accurately, potentially responsible parties
* An understanding of damages most often associated with construction defects, as well as a greater ability to identify conditions triggering coverage
To register for the event, please email Don MacGregor at dmac@berthowe.com. If you have any questions, please feel free to contact Don at (800) 482-1822 (office) or (714) 713-4956 (cell).
Read the court decisionRead the full story...Reprinted courtesy of
Meet Orange County Bar Associations 2024 Leaders
April 08, 2024 —
Dolores Montoya - Bremer Whyte Brown & O'Meara LLPBremer Whyte Brown & O’Meara, LLP is proud to share that CEO/Founding Partner Nicole Whyte and Orange County Bar Association’s (“OCBA”) leaders are featured in the Orange County Lawyer (“OCL”) publication, Who’s Who In The OCBA, that was released earlier this month. To see this year’s 2024 board of directors, section leaders, committee chairs, task forces, and charitable fund board, please click
here.
Nicole Whyte provides individualized counseling and representation in all areas of Family Law. She has served on various OCBA legal committees and boards for over two decades and was elected to OCBA’s Board of Directors in 2024. She is committed to supporting the needs of the OCBA and its thriving and diverse OC legal community.
Read the court decisionRead the full story...Reprinted courtesy of
Dolores Montoya, Bremer Whyte Brown & O'Meara LLP
Adjuster's Report No Substitute for Proof of Loss Under Flood Policy
July 30, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe insured's claim for flood coverage was denied when the insurer refused to accept an adjuster's report submitted without a proof of loss. Jackson v. Fid. Nat'l Ins. Co., 2015 U.S. Dist. LEXIS 66589 (E.D. La. May 21, 2015).
Plaintiff's property was damaged by Hurricane Isaac. Defendant Fidelity provided flood coverage for the property through the National Flood Insurance Program (NFIP). After plaintiff submitted a flood claim, she executed a proof of loss for $53,803.02. A second proof of loss for contents was submitted in the amount of $26,556.13. Fidelity paid both these claims.
Thereafter, an adjuster's estimate of plaintiff's damages, totaling $284,332.91, was submitted to Fidelity. Plaintiff did not submit a supplemental proof of loss for this claim. Fidelity refused to pay the claim and plaintiff filed suit.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Packard Condominiums Settled with Kosene & Kosene Residential
August 27, 2014 —
Beverley BevenFlorez-CDJ STAFFResidents of the Packard Condominiums in Indianapolis, Indiana “have settled a two-year-old lawsuit with developer Kosene & Kosene Residential,” according to the Indianapolis Business Journal. The Homeowners association stated that “the agreement would lead to repayment of a construction loan and avoidance of a special assessment on residents.”
The association claimed to have spent “$3 million on ‘renovation and remediation’ of subpar construction of the condo building,” reported the Indianapolis Business Journal.
The article also declared that at least 25 subcontractors participated in the mediation.
Read the court decisionRead the full story...Reprinted courtesy of
Tennessee Civil Engineers Give the State's Infrastructure a "C" Grade
December 05, 2022 —
American Society of Civil EngineersNASHVILLE, TN. — The Tennessee Section of the American Society of Civil Engineers (ASCE) released the 2022 Report Card for Tennessee's Infrastructure today, with 13 categories of infrastructure receiving an overall grade of a 'C', the same grade given by the section in its 2016 report. That means Tennessee's infrastructure is in mediocre condition and requires attention, but is a step ahead of the national average of "C-" given in the 2021 Report Card for America's Infrastructure. Tennessee's freight network is strong and plays a major role in the national economy as a key mobility hub and its energy grid has been reliable, allowing families and businesses to operate efficiently. Many of the state's systems are performing at or above national averages; however, a surge in population growth, increasingly severe weather impacts, and insufficient data on the current condition of several infrastructure sectors threaten the long-term viability of the state's overall network. Civil engineers graded aviation (C+), bridges (B), dams (D+), drinking water (C+), energy (C+), inland waterways (C), parks (C+), rail (C), roads (C), solid waste (C+), stormwater (C+), transit (D+), and wastewater (C-).
"As one of the most prominent mobility hubs in all of America, infrastructure is the backbone to all we do here in Memphis, and everything we can accomplish throughout the great state of Tennessee," said Memphis Mayor Jim Strickland. "Our airports, roads and bridges keep our economy flowing, drawing more jobs and businesses in the future. The ASCE report is a critical tool for tracking our progress, in addition to highlighting where we could use some work. With more people flocking to Tennessee than ever before, this is an exciting time and our infrastructure networks must be ready to help us capitalize on the opportunity."
To view the report card and all five categories, visit https://infrastructurereportcard.org/state-item/tennessee/.
ABOUT THE AMERICAN SOCIETY OF CIVIL ENGINEERS
Founded in 1852, the American Society of Civil Engineers represents more than 150,000 civil engineers worldwide and is America's oldest national engineering society. ASCE works to raise awareness of the need to maintain and modernize the nation's infrastructure using sustainable and resilient practices, advocates for increasing and optimizing investment in infrastructure, and improve engineering knowledge and competency. For more information, visit www.asce.org or www.infrastructurereportcard.org and follow us on Twitter, @ASCETweets and @ASCEGovRel.
Read the court decisionRead the full story...Reprinted courtesy of
Firm Seeks to Squash Subpoena in Coverage CD Case
May 20, 2015 —
Beverley BevenFlorez-CDJ STAFFAccording to the New Jersey Law Journal, the insurance firm Carroll McNulty & Kull was “subpoenaed in connection with an out-of-state coverage dispute stemming from construction litigation that yielded a $55 million verdict," and "is fighting a demand that it hand over its file.”
Carroll McNulty & Kull told the New Jersey Law Journal that “the subpoena ‘is a transparent attempt to obtain documents ordinarily protected by the attorney-client privilege and work product doctrine.”
The New Jersey Law Journal reported that the subpoena “seeks ‘your entire file for the time period beginning Oct. 1, 2012, and ending June 19, 2014, pertaining in any manner to insurance policies issued by Crum and Forster Specialty Insurance Company.’ Included in the demand are ‘all handwritten or electronically stored notes; electronic and other communications,’ ‘emails and all attachments to those emails, time records, and bills,’ and ‘any documents and materials reviewed.’”
U.S. District Judge Peter Sheridan has been assigned the motion to quash.
Read the court decisionRead the full story...Reprinted courtesy of
Florida Appellate Courts Holds Underwriting Manuals are Discoverable in Breach of Contract Case
February 14, 2022 —
Andrea DeField & Adriana A. Perez - Hunton Insurance Recovery BlogRecently, Florida’s First District Court of Appeals handed down a victory for policyholders when it affirmed a Circuit Court’s order compelling an insurer to produce its underwriting manual in a breach of contract action. In People’s Trust Insurance Co. v. Foster, No. 1D21-845 (Fla. 1st DCA Jan. 26, 2022), the policyholder, Mr. Foster, filed a breach of contract claim against his insurer, People’s Trust, after People’s Trust failed to pay his insurance claim for damage caused to Mr. Foster’s home due to a leaking water pipe. People’s Trust denied Foster’s claim because “Foster’s pipe damage predated the policy’s inception.”
During discovery Foster requested People’s Trusts’ underwriting manual(s) in effect at the time his policy was issued or renewed. People’s Trust objected to the request. In response, Foster filed a motion to compel production of the underwriting manual(s). After a hearing, the Circuit Court granted Foster’s motion and People’s Trust sought a writ of Certiorari from the First District Court of Appeal to quash the order compelling production.
Reprinted courtesy of
Andrea DeField, Hunton Andrews Kurth and
Adriana A. Perez, Hunton Andrews Kurth
Ms. DeField may be contacted at adefield@HuntonAK.com
Ms. Perez may be contacted at pereza@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
The Harmon Hotel Construction Defect Trial to Begin
October 29, 2014 —
Beverley BevenFlorez-CDJ STAFFThe trial involving the Las Vegas Harmon Hotel, which is currently being demolished piece by piece due to construction defects, is ready to begin six years after the defects were first discovered, reported the Las Vegas Review-Journal. It’s an unusual case for multiple reasons. The trial is expected to last a year, and the number of attorneys involved in the case required chairs to be removed from the galley to accommodate lawyer tables, which are wired with monitors and microphones. In addition, “two 80-inch monitors are being installed for the jury.”
The Las Vegas Review-Journal further reported that “each party will have its own technology team to display the more than 3 million digitally stored pieces of evidence.” Michael Doan, the court’s information technology director, told the Las Vegas Review-Journal that the “paper list of that evidence fills more than 100 document-storage boxes.”
The case “involves more than $400 million in damage claims.” Construction on the Harmon Tower was stopped after a “structural engineer hired by MGM Resorts determined the building was unsafe and could topple if an earthquake of a magnitude of 7.7 were to hit Las Vegas.”
Read the court decisionRead the full story...Reprinted courtesy of